skip to Main Content

New High Velocity Hurricane Zone (HVHZ) Systems including Level E rated system for essential buildings

How StoPanel® prefab systems streamlined a high-rise build in NYC.

With 270 mega panels installed by crane—without closing a single street—the project hit schedule goals while elevating design and controlling costs.

Download the full case study to see how innovative prefab solutions brought efficiency, safety, and sleek design to this complex urban build.

  • Please review our updated Privacy Policy
  • This field is hidden when viewing the form
  • This field is hidden when viewing the form
  • This field is hidden when viewing the form
  • This field is hidden when viewing the form

Back To Top

Your compare list

Compare
REMOVE ALL
COMPARE
0
×

Keep the Inspiration Coming!

Subscribe to the Sto Blog for the Latest Updates in Inspiring Building Design and Construction.

  • Please review our updated Privacy Policy
  • This field is for validation purposes and should be left unchanged.

SEARCH

Use the search bars below to search by keyword(s), by product name or by product number. If you are having problems finding information, please contact us here.

SITE SEARCH

PRODUCT SEARCH