|
Sto Corp.
StoGuard Frame Construction
StoGuard Frame Construction
DocumentsDate added
20.00a Siding or Brick Cavity Wall
20.00b Portland Cement Stucco and Adhered Masonry Veneer over Lath
20.00c StoGuard with Furring and Backer Board (Engineered Wall Design)
20.00d Sto DrainScreen
20.00e Continuous Insulation - Siding or Brick Cavity Wall
20.00f Continuous Insulation - Portland Cement Stucco and Adhered Masonry Veneer
20.01 Inside Corner - Common Substrate
20.02 Outside Corner - Common Substrate
20.03a Brick Ledge at Foundation with Masonry Anchors on Steel Frame
20.03b Brick Ledge at Foundation Wood Frame
20.03c Masonry Anchor Backer Seal
20.10a Termination at Grade - Sheathing Flush with Foundation
20.10b Termination at Grade - Sheathing Overlapping Foundation
20.20a Rough Opening Protection Sto Gold Fill and StoGuard Mesh
20.20b Rough Opening Protection with StoGuard Fabric
20.20c Rough Opening Protection with StoGuard Fabric and StoGuard Tape at Sill (for abuse-resistance at sill)
20.20d Rough Opening Protection with StoGuard Tape
20.20e Rough Opening Protection with StoGuard RapidSeal
20.23a Flashing Integration at Window Opening - Box Window
20.23b Concealed Flashing at Sill - Nail Fin Window
|