|
Sto Corp.
StoGuard Masonry Construction
StoGuard Masonry Construction
DocumentsDate added
21.00a Components and Surface Preparation: Option 1
21.00b Components and Surface Preparation: Option 2
21.00c Surface Preparation over Irregular CMU
21.00d Furring Installation (Engineered Wall Design)
21.00e Sto DrainScreen
21.00f Continuous Insulation
21.03a Brick Veneer Tie Attachment
21.03b Hook-style Masonry Tie
21.10a Termination at Grade
21.10b Termination at Grade with Brick Ledge
21.20G Rough Opening Protection with Sto Gold Fill and StoGuard Mesh
21.23 Window Sill / Jamb
21.24 Window Head
21.51 Vertical Expansion Joint
21.52 Vertical Joint at Column
21.53 Inside Corner Dissimilar Materials
21.54 Structural Shelf Angle or Lintel
21.55 Horizontal Joint at Floorline
21.60a Roof Termination with Gravel Stop
21.60b Parapet Cap
|