Sto Worldwide
| Site Map | About Us | Contact Us | Press Room

Stocorp.com


StoTherm EIFS Home

StoTherm EIFS Brochure







StoTherm Premier NExT
StoTherm Premier NExT incorporates the StoGuard™ system to create a continuous secondary air barrier and moisture barrier behind StoTherm Premier to protect the sheathing and other construction components. Starter track with weep holes and vertical ribbons of adhesive provide drainage capability for incidental moisture.
* StoTherm Premier NExT™ comes with a 15-Year Limited Materials & Labor Warranty
Products (Adobe PDF)SpecificationDetails
StoGuard Assembly:
Sto Gold Coat
Sto Gold Fill and Mesh
Sto BTS® Plus Adhesive
(or Sto BTS® Silo)
Sto EPS Insulation
Sto Reinforcing Mesh
Sto BTS® Plus Base Coat
(or Sto BTS® Silo)
StoSilco Lit Finish
P100G - Long Form
P100G - Short Form
StoTherm NExT ( jpg & pdf )
StoTherm NExT CAD (dwg)


©
1998-2007 Sto Corp. All rights reserved
marketingsupport@stocorp.com
3800 Camp Creek Parkway Building 1400, Suite 120 Atlanta, GA 30331 (800) 221-2397